Recently permitted mixed-use development in the heart of Jamestown. The Site presented considerable challenges for parking, storm-water and establishing overall site elevations.
This beautiful and creative design was prepared by Herk-Works Architecture in Middletown. Construction has begun in the Fall of 2022 and is scheduled to be completed early summer 2023.